Power Is Moving In

The Library is adding 53 tables with power to the 4-story and 8-story buildings. Many of the tables have already been brought into the Library and distributed throughout the floors; outlets on the tables will be operational by the end of the week. The additional tables will help to offset the loss of seats that will be inevitable during the upcoming construction project. As soon as the quarter is over, we will also be moving as many tables and chairs as possible from the 2-story building, which is closing for renovation, into the remaining buildings.

Power tables on the 3rd floor