![[InfoSurf]](/gallery/is.gif)
![[Departments]](/gallery/lauc.gif)

Highlights of the Budget Presentation:
A three-year budget projection was presented, from 1997/98 to 1999/2000.
A summary was given of library funding requested for these three fiscal
years.
This budget presentation was prepared at the request of the Vice
Chancellor.
UCSB
ranks last of the UC libraries in students per librarian,
acquisitions $/student &
faculty, and 6 out of 7 in faculty per librarian.
Library staffing levels have fallen
from 201 in 1990/91 to 146 in 1997/98.
In materials expenditures, UCSB ranks 100 out of
108 ARL Libraries.
Three major factors that have driven the Library's budget over the past
5
years have been reduction in library staffing, major automation activity,
and the deterioration
of the book budget. The money saved from reduced
staffing has been used for the infrastructure
and equipment needed for
automation.
Current funding requests that the Library has forwarded
to campus include:
1. Assistance for costs relating to providing public access to the
PEGASUS
II system.
2. In 1998/99 and 1999/2000, the Library is requesting funding from the campus for a computer technician position and $50,000 per year to amortize computer hardware.
3. A 10% increase to the book budget for each of the next three years, beginning 1997/98. Without that increase, another round of serial subscription cuts is inevitable.
4. Funding for library materials for the School of Environmental Science and Management. In 1995/96, the campus agreed to provide funding for these materials as FTE are added to the school. In 1996/97 and 1997/98, the Library received funding for faculty added during those years, but the 1997/98 allocation did not include continued funding for 1996/97 FTE.
The
current request is not for new funding, but funding to comply with the
agreement already
in place.
The budget presentation summarized by focusing on three key areas:
1.
The Library needs major funding assistance to avoid further
deterioration in the book budget.
2. The Library will need assistance from campus to expand PEGASUS II into public areas.
3. The Library will need to spend $400,000 - $500,000 per year over the
next several years for
basic computer hardware replacement, but there is
no provision in the state or campus funding
for this type of expense.
Author: Lynne Hayman hayman@library.ucsb.edu
Last modified: 1/28/98
Direct questions or comments about this page to the author or to
webmaster@library.ucsb.edu.
This is an official
University of California, Santa Barbara Library web page.